Virtus deliver Medium Pipeline Repair

Virtus deliver Medium Pipeline Repair

Virtus Consult were appointed to Project Manage and Construction Manage the replacement of a Medium Temperature Hot Water (MTHW) pipeline for our Derby based blue chip client.  Project delivery was time critical to meet a pre-determined production shutdown, with reinstatement of the MTHW on programme essential to meet production demand, whilst maintaining unencumbered access to the factory site throughout, and during a whole scale scheduled electrical shutdown.  Despite encountering a number of obstacles the project was successfully delivered under programme and exceeded our client’s quality expectations given the programme constraints.  On the basis of this success our client has asked Virtus to manage their forthcoming pipeline replacement  works.

Share